Project
WaterThe project
Construction of a well to secure safe drinking water.
Stages
Stage 1 · €10,000reached
800 people · 1 water point · 4 latrines
The drilling to 80 metres and the water test: a laboratory analysis in Niamey before the well opens. The same stage builds the first four latrines beside the neighbourhood's school, so the well serves 800 people from the start.
Stage 2 · €6,000€5,085 of €6,000
adds 400 people · 6 latrines
The solar pump and the 20,000-litre tank: water stays available through the dry season, when the old well's level drops, and reaches 400 more people. Six new latrines in the yards of the families furthest from the tap; the panels and the pump carry a five-year warranty.
Stage 3 · €4,000the plan ahead
adds 4 handwashing stations
The four taps across the neighbourhood, each with its handwashing station, and the training of the water committee the residents elect (half of it women) and of the two technicians who will do the routine repairs.
The project in figures
750of 800people reached
Water
90cause points
- 1of 1water point50 cause points
- 4of 4latrines40 cause points
- —handwashing stations4 planned in stage 3
Reported by the organisation · updated
How we countUpdates
Digging complete; the submersible pump is being installed.
- People reached so far (+250)
- 750
- Latrines built so far
- 4
The well is drilled and the pump works: 500 people now draw their water from it.
- People reached so far (+200)
- 500
- Water points built or restored so far
- 1
Published on 18 February 2026
Reported when the project joined Humapact, .
- People reached
- 300
Supporters · 8
Companies:
- Cascina Doralice €300
- Meridian Software €100
People:
- Paolo Esposito €400
- Davide Moretti €400
- Giorgio Ferrara €200 Simulated pilot figures — no real funds move.
Published on 18 February 2026

