Skip to content

Project

Village BoreholeWater

The project

A 60-metre borehole with a hand pump for 800 people who walk 5 km for water today.

The project in figures

1,050of 800people reached

Water

50cause points

  • 1of 1water point50 cause points

Reported by the organisation · updated

How we count

Updates

  1. The hydrogeological survey found water at 48 metres; drilling is booked for September.

    People reached so far (+950)
    1,050
    Water points built or restored so far
    1
  2. Published on 2 July 2026

  3. Reported when the project joined Humapact, .

    People reached
    100

Supporters · 7

Companies:

  1. Nordwal Logistics €150

People:

  1. Chiara Conti €600
  2. Irene Valentini €187
  3. Pietro Rinaldi €115
    Simulated pilot figures — no real funds move.

Published on 2 July 2026